ERP Implementation Support

A new system that goes live on bad data compounds the problem for years.

Implementation projects run to a date. Data preparation is the work most often compressed when that date gets close — and opening stock is the data nobody checks because everyone assumes it is already right.

What we do before go-live

  • A full physical count to establish opening quantities at the cut-off
  • Item master cleanup: duplicates, obsolete codes, descriptions, units of measure
  • Mapping existing stock data to the structure the new system expects
  • Upload file preparation and validation
  • Support during the load itself

And afterwards

A verification count a short period after go-live confirms the system is holding accurate quantities, and catches configuration problems while they are still cheap to fix.

For implementation partners

We work directly with ERP and POS implementers as the field data arm of the project. You manage the system, we establish and prepare the inventory data it starts on. Our reporting is structured so it can be handed to the client as part of the project record.

What data you receive

  • Verified opening stock quantities at an agreed cut-off
  • A cleansed, structured item master
  • Validated upload files in the required format
  • A post-go-live verification count
  • Documentation of the opening position for the project record

Going live soon?

The cheapest time to fix inventory data is before it is inside the new system.

Request a Site Assessment

Nairobi based, with deployment capability across East Africa